Cashing out doorways allows you to give an aesthetic appearance and put the final touch in the repair of the premises. The installation of platbands in their significance is similar to the device of a plinth on the floor or a cornice on the ceiling. That is why the question of how to install platbands on the door remains quite significant when carrying out repairs.
Content
- Preparatory work before installing platbands
- Features of the choice of material
- Phased installation of door platbands
- Nuances in carrying out cashing
Preparatory work before installing platbands
Before installing platbands, care should be taken about adjacent walls. They should be carefully aligned, smooth and located in the same plane on both sides of the doorway. If you neglect these recommendations, then after completion of work there will be small gaps between the wall and cashing. Of course, with the help of the design itself, it remains possible to hide small irregularities with a difference of a few millimeters, but large differences cannot be hidden already.
Features of the choice of material
When choosing a product for cashing, special attention should be paid to the similarity of the veneer structure at the door and the platbands. Due to the huge variety of materials – plastic, natural wood, MDF, from which platbands are made, you can make the best choice without any problems. The front part is covered with varnish, laminating film, veneer or paint, it can be of various shapes, embodying original design ideas. Each type of product has its own special nuances during installation..
When installing platbands, it is important to achieve smooth docking and lack of gaps. The easiest option is to install products with a simple rectangular shape or close to it.
In this situation, it is enough to dock them at a right angle. But for most platbands that have a shaped on the front side, a docking at an angle of 45 degrees is required.
Phased installation of door platbands
The installation of platbands on the door begins with measurements. Using a tape measure, you need to measure the distance from the junction of the ceiling and loop timber to the floor, add 1 centimeter to the result.
Work should begin from the side of the door, from which you can open it on yourself. Next, at an angle of 45 degrees, saw off the clypeus. This operation can be performed using a mechanical or conventional miter box with certain skills, and using a professional electric crosscutting machine you can get the best quality cut without small chips of decorative cladding.
The measured distance (height from the floor to the junction of the beam) is the beginning of the angle at which you need to saw. Drawings with visualization of the workflow allow you to make the installation of platbands more understandable. Similar actions need to be done with the second platband. Naturally, the distance must be re-measured.
After preparing the side cashing, it should be nailed, leaving the top unsecured. Platbands set at a distance of 0.5-1 cm from the edge of the box. Planks with a soft wood base are nailed with thin finishing nails or simple nails without caps (they are bitten off with pliers). Platbands from MDF need additional preparation, which consists in preliminary drilling of non-through-hole guides. This procedure allows you to carefully hammer a nail, reducing the risk of damage to the platband to a minimum.
Having studied all the features and nuances of these repair work, you can conduct them yourself.
Nuances in carrying out cashing
To make the presence of a nail imperceptible, you should use a wax corrector of a suitable color or acrylic sealant. If there are even walls of the doorway to fix the platbands, you can use liquid nails. This method avoids the presence of traces of nails..
The main difficulty in installing the platbands is to prevent the formation of a gap between the planks. To avoid errors when cutting the upper clypeus, the upper bar is pre-wound for vertical, making marks on it. This allows you to achieve a complete match platbands.
The finished upper part needs to be nailed into place, the side planks are also nailed to the end. On this, the installation of platbands, on the one hand, is considered completed. Next, the whole procedure is repeated for the reverse side. door frame, acquiring a finished look.
Often there are discrepancies of the strips at the place of their joining. This situation arises due to wall irregularities or curvature of platbands during improper storage. This small flaw can be corrected by fastening the planks with a finishing clove to each other. When micro-gaps between platbands appear, to correct them, use a wax corrector or acrylic sealant of the desired shade.
It is interesting! With the use of modern technologies, platbands of telescopic construction appeared, having on one side a protrusion – a slot. It is a fastener included in the groove of the door frame or extension. This model allows you to hide small surface irregularities..
According to the designers, to ensure the uniform style of the apartment, the same platbands should be used. But, unfortunately, not all doorways allow the use of platbands of the same size. In this case, they resort to sawing planks.
It is important! Sawing up the clypeus more than three-fourths of its width is not permissible, as this will ruin the entire pattern.
The main requirements for the installation of platbands on the door are accuracy when performing work and care when taking measurements. Compliance with these conditions will help to make high-quality cashing of doorways and give the interior a complete look.